Pilar de los Horneros
Gated community, Carrasco & Canelones
Photo: barrioprivado.com.uy
- 330
- Lot size, m²
- U$D 300
- HOA fees
Sustainable homes with pools and solar panels next to Mall de los Horneros
About
Pilar de los Horneros is a gated community of turnkey houses on Camino de los Horneros (Canelones), next to Mall de los Horneros and less than 3 km from the Interbalnearia highway. It was developed by Balsa & Asociados, which launched it in 2020 as Uruguay's first self-sustaining private neighbourhood; construction began that year and the first stage closed in April 2023 with 40 houses handed over.
Plots are not sold on their own, only finished houses: traditionally built two-storey homes of about 130 m² with three bedrooms (one en suite), a study in some models, a covered barbecue with grill and wood oven, a pool, a vegetable garden and parking for two cars, on plots of roughly 330–400 m². The community is laid out in four blocks with internal streets, ponds and green space.
Houses have solar panels under a UTE micro-generation contract, heat-pump underfloor heating and low-flow fittings. The project earned preliminary EDGE Advanced certification (the World Bank's green-building programme), with estimated savings of 48% in energy and 31% in water.
There is private security, access control and CCTV. Common charges of about UYU 12,000–15,000 a month, depending on the source, cover upkeep of common areas, gardening and lawn-mowing for each house, pool cleaning, waste collection and an on-demand van. There are fire pits and play areas.
In 2023–2024 houses were offered from about U$D 365,000; in 2026 resales were listed at about U$D 395,000–400,000. In 2024 Balsa & Asociados filed for creditor protection; resale listings state whether a house is affected.
Photos
On site
- Playground
Fact sheet
Land
Costs
- Lot price
- no data
- Price per m²
- no data
- HOA fees
- U$D 300 – U$D 375 per month5
- Entry fee
- no data
Location
Building rules
- Minimum house
- no data
- Maximum height
- no data
- FOS (site coverage)
- no data
- FOT (floor area ratio)
- no data
- Time to build
- no data
- Architecture committee
- no data
- Legal regime
- no data
Utilities and security
- Water
- no data
- Sewage
- no data
- Fiber internet
- no data
- Paved streets
- no data
- 24 h security
- no data
- Closed perimeter
- no data
Community rules
- Pets
- no data
- Short-term rental
- no data
25 fields are still missing. Do you live or sell here? Write to us and we’ll complete it.
Distances
By road, computed with OpenStreetMap and OSRM. Estimated driving time without traffic.
Towns and airports
- Carrasco airport
- 9 km14 min
- Montevideo
- 28.3 km39 min
- Punta del Este airport
- 89.4 km90 min
- Maldonado
- 104 km105 min
- Punta del Este
- 109 km112 min
- La Barra
- 115.1 km118 min
- José Ignacio
- 135.5 km135 min
Nearest services
- Beach
- 6.8 km12 min
- SupermarketTienda Inglesa
- 3.3 km7 min
- Pharmacy
- 3.7 km9 min
- ClinicPoliclinica Pinar Norte
- 4.6 km11 min
- HospitalClínica Preventiva
- 7.8 km12 min
- SchoolEscuela 58 Joaquim José Da Silva Xavier-Tiradentes
- 2.5 km6 min
- Gas station
- 3.4 km7 min
- RestaurantLa Finca 1941
- 3.1 km6 min
- Golf course
- 1 km2 min
Location
Sources
Where each figure came from. Bracketed numbers next to values point to this list.
-
1
barrioprivado.com.uy Single source, checked on 30.09.2026
-
2
infonegocios.biz Confirmed, checked on 30.09.2026
InfoNegocios, 16.09.2020: Balsa & Asoc. (Juan Balsa, Mateo Larre Borges, arq. Lucía Bianchi); 40 casas, 400 m² de superficie promedio cada una, 130 m² construidos; inicio de obra octubre 2020, primeras entregas septiembre 2021; precios USD 288.000–36
-
3
elobservador.com.uy Single source, checked on 30.09.2026
-
4
infocasas.com.uy Single source, checked on 30.09.2026
-
5
montevideo.com.uy Estimate, checked on 30.09.2026
Montevideo Portal, 01.11.2023: gastos comunes aprox. $ 12.000 (mantenimiento, seguridad privada, camioneta a demanda, limpieza de piscina, corte de césped); casas USD 380.000–430.000; EDGE: −48 % energía, −31 % agua. CasasWeb CW218896 (2026): «Gastos
-
6
nominatim.openstreetmap.org Confirmed, checked on 30.09.2026
-
7
project-osrm.org Estimate, checked on 30.09.2026
-
8
openstreetmap.org Estimate, checked on 30.09.2026


